Red Tree were contracted during the summer holidays at Priestnall High School with the goal of refurbishing the buildings to create an inclusive and supportive educational environment that supports growth and exploration for all pupils. The projects include the construction of a new dance studio and main stage for the performing arts department, the creation of a new student services area, and the modernization of the school’s IT department.
Director, Ellis Williams Architects
Red Tree were contracted to build and develop the planned extension to Green End Primary School.
Prior to Red Tree’s involvement, the extension was designed as a porta-cabin short-term solution, potentially requiring future development. Red Tree provided significant cost savings that allowed for a more sustainable solution to meet the clients preferred design and layout. The savings were achieved by utilising SIPS panels and off-site manufacturing.
Green End Primary gained an additional classroom and a multifunctional workspace which could adapt to the school’s needs.
School Business Manager, Northridge High School
Red Tree secured another contract at North Ridge High School to design and build their new 160m2 extension incorporating offices, meeting and teaching spaces and a state of the art gym to cater for the ever-changing needs of the school.
The original tender figure was maintained throughout and the deadline was achieved. This was another successful project with North Ridge High School, maintaining our great relationship.
Director UDC
Following a competitive tender process Red Tree were pleased to be selected as the main contractor for a large multi-site Capital Works programme for NHS Property Services. This was Red Tree’s second involvement in the Capital Works scheme following the success of 2015.
The Capital Works scheme highlighted Red Tree’s ability to deliver complex multi-site projects, operating on over 29 sites for 12 months of on-site works. A number of refurbishment works were undertaken including; brand new reception areas, extensions, entrances, remodelling of existing spaces and refurbishing GP surgeries, staff and patient facilities.
Deputy General Manager, South Manchester Healthcare Ltd
General Medical Council
Red Tree were approached by the General Medical Council to design and create a modern and vibrant common room area for staff.
The brief was to design a space where staff could unwind and relax during their busy day. Red Tree completed this project on a turn-key basis, to the specific requirements provided by the GMC.
Operations Director, IWMN
The Imperial War Museum appointed Red Tree as the main contractor on their new entrance and reception area.
The brief was to design a striking entrance leading into a brand-new reception area, allowing the museum to open their doors to visitors on the quay side. This project linked well with the redevelopment of Media City.
The project was delivered to high standards, meeting the programme deadline and budget.